G
Guest
I don't get it. Why should it be this Friggin hard????
I go through the Backup wizard and specify a weekly backup of everything,
running on M, T, W, Th, F. I specify the time. I have a 4mm dat tape in the
drive. I see the damm task in the Scheduled tasks window. The time to
backup comes up and nothing happens. In the Scheduled tasks window, all I
see is under Results (0x8023)
What is happening here and what am I missing?????
I just want to be able to run an unattended full backup every weeknight.
Also, I don't want the system to care what tape is in the drive. I just
want it to write over whatever is in the drive. Can I do this?????
How???? Please be detailed....
I go through the Backup wizard and specify a weekly backup of everything,
running on M, T, W, Th, F. I specify the time. I have a 4mm dat tape in the
drive. I see the damm task in the Scheduled tasks window. The time to
backup comes up and nothing happens. In the Scheduled tasks window, all I
see is under Results (0x8023)
What is happening here and what am I missing?????
I just want to be able to run an unattended full backup every weeknight.
Also, I don't want the system to care what tape is in the drive. I just
want it to write over whatever is in the drive. Can I do this?????
How???? Please be detailed....