S
stevej
Hi,
I'm trying to use 3 tapes on a 20gb tape drive to backup the following
way.
Tape 1 runs a full backup on Monday. It additionally overrides anything on
the tape
It then runs differential backups until Sunday
Tape 2 starts the cycle over again on Monday with the same procedure as tape
1
Tape 3 does the same thing as Tape 2
On the fourth week I insert Tape 1 again and the cycle begins.
My problem that I'm seeing is that the scheduled tasks don't run. Also,
shouldn't this 3 tapes be part of a set?
Thanks
Steve
I'm trying to use 3 tapes on a 20gb tape drive to backup the following
way.
Tape 1 runs a full backup on Monday. It additionally overrides anything on
the tape
It then runs differential backups until Sunday
Tape 2 starts the cycle over again on Monday with the same procedure as tape
1
Tape 3 does the same thing as Tape 2
On the fourth week I insert Tape 1 again and the cycle begins.
My problem that I'm seeing is that the scheduled tasks don't run. Also,
shouldn't this 3 tapes be part of a set?
Thanks
Steve