backup

  • Thread starter Thread starter stevej
  • Start date Start date
S

stevej

Hi,

I'm trying to use 3 tapes on a 20gb tape drive to backup the following
way.

Tape 1 runs a full backup on Monday. It additionally overrides anything on
the tape
It then runs differential backups until Sunday

Tape 2 starts the cycle over again on Monday with the same procedure as tape
1

Tape 3 does the same thing as Tape 2

On the fourth week I insert Tape 1 again and the cycle begins.

My problem that I'm seeing is that the scheduled tasks don't run. Also,
shouldn't this 3 tapes be part of a set?

Thanks
Steve
 
Back
Top