D
Doug B
I have searched the forum and can't find a post on this topic. When
scheduling a backup, same time every day, it fails to run. There is no error,
just does not run. When checking the backup log it shows nothing. Can run
manual backups with no problem so it seems to be a scheduling issue. User
rights are ok for this operation so am unsure why it fails. Any help
appreciated. This o/s is updated to sp/2. Thanks.
scheduling a backup, same time every day, it fails to run. There is no error,
just does not run. When checking the backup log it shows nothing. Can run
manual backups with no problem so it seems to be a scheduling issue. User
rights are ok for this operation so am unsure why it fails. Any help
appreciated. This o/s is updated to sp/2. Thanks.