K
KarlS
Is it even worth spending much more time playing with the settings?
Personally I think it is very poor but some people rave on about it.
My problem is:
I have schedulled a job that runs Mon-Friday and backs everything up. This
appears to work fine on a new tape but when inserting the used tapes the job
log reports "cannot locate the specified media or backup device". In the
evernt log I noticed that the Removeable Storage service stops and starts at
the time that the backup was schedulled.
I belive that if I use the AT command to schedule the jobs it will work but
there must either be something I'm missing or the GUI backup is rubish.
Any (useful) comments.
KarlS
Personally I think it is very poor but some people rave on about it.
My problem is:
I have schedulled a job that runs Mon-Friday and backs everything up. This
appears to work fine on a new tape but when inserting the used tapes the job
log reports "cannot locate the specified media or backup device". In the
evernt log I noticed that the Removeable Storage service stops and starts at
the time that the backup was schedulled.
I belive that if I use the AT command to schedule the jobs it will work but
there must either be something I'm missing or the GUI backup is rubish.
Any (useful) comments.
KarlS