Disaster Recovery

Z

Ziek

I'm performing a disaster recovery test of my forest, which has two domains.

In a lab environmnent, I want to build two servers, one DC for the root
domain, and another DC for the child domain.

I'm not sure if after installing the O/S on the server, do I need to dcpromo
the box and create an identical domain name/sysvol location, etc.. before
running the system state restore, or should I leave the box as a plain
standalone server with the same name, and then perform a system state
restore on to this standalone box?
 

Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments. After that, you can post your question and our members will help you out.

Ask a Question

Top