I am trying to create a timesheet for my students and am running into issue I
am not sure how to solve. Any suggestions would be greatly appreciated.
The student are to work on a series of projects that take anywhere from 20
minutes to ca. 6 hours during a class period of 83 minutes. I want to be able
to keep track of two things. First, the time sheet needs to keeps track of
the total time spent on a particular project (possibly across more one day).
This total will be compared with a percentage of the time I think is
appropriate for that project and a then a grade is assigned. Second, is to
keep track of the total amount of time that is used toward projects (possibly
more than one in a single class period) and then compare this total with the
total number of minutes in the class period (i.e., 83) to determine "wasted"
time.
I have tried setting this time sheet up two different ways: "project based"
and "date based". In other words, I have been able to do each of these
procedures independently. However, I am having a mental block as to how to
set this up so that both would occur at the same time.
Please help with any ideas.
am not sure how to solve. Any suggestions would be greatly appreciated.
The student are to work on a series of projects that take anywhere from 20
minutes to ca. 6 hours during a class period of 83 minutes. I want to be able
to keep track of two things. First, the time sheet needs to keeps track of
the total time spent on a particular project (possibly across more one day).
This total will be compared with a percentage of the time I think is
appropriate for that project and a then a grade is assigned. Second, is to
keep track of the total amount of time that is used toward projects (possibly
more than one in a single class period) and then compare this total with the
total number of minutes in the class period (i.e., 83) to determine "wasted"
time.
I have tried setting this time sheet up two different ways: "project based"
and "date based". In other words, I have been able to do each of these
procedures independently. However, I am having a mental block as to how to
set this up so that both would occur at the same time.
Please help with any ideas.