G
Guest
MS Outlook 2003 - I have several tasks with no due date assigned. When I
sort the tasks by due date these task appear at the top of the list.
However, I'd like them to appear at the bottom, after tasks with assigned due
dates. How can this be done.
sort the tasks by due date these task appear at the top of the list.
However, I'd like them to appear at the bottom, after tasks with assigned due
dates. How can this be done.