Copying a split database

P

PeterJC

I have a split database (Access 2007) with the back end on a server and
copies of the front end on various local hard drives. I want to make some
functional changes on the front end, and to test those changes with various
data entries etc.

I’ve copied and renamed the front and back ends of this application and have
linked the front end copy to the back end copy, but I find that when I make
data entries to the copied databases, the changes find their way into the
original back end file. It appears that the tables in the copied back ends
are referenced in some way to the original back end, since a table ‘tabnm’ in
the original will be present in the opened copied front end together with
another table called ‘tabnm1’, and only the latter table will be linked to
the copied back end.

What do I do about this? I wondered if I should delink the copied front e nd
from the original back end, but I don’t k now how t o do this.

Suggestions would be very welcome, thanks.
 
J

John W. Vinson

I have a split database (Access 2007) with the back end on a server and
copies of the front end on various local hard drives. I want to make some
functional changes on the front end, and to test those changes with various
data entries etc.

Did you see the three answers posted to your earlier post, all sent today?
 

Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments. After that, you can post your question and our members will help you out.

Ask a Question

Top