G
Guest
I have never made a chart from the beginning. I have copied and pasted
working charts and have changed formulas but have not started one from the
beginning and need help. Here is my info
mg\l MV
..2 255.6
..4 252.2
..5 249.5
..75 241.1
1.0 233.8
5.0 195.6
10.0 182.1
These numbers mg\l and mv will change each testing period. On my graph down
the left side I have the numbers
10.0
9.0
8.0
7.0
6.0
down to 1.0
then it goes from .9 to .1
At the bottom of the graph I start at 300 and count down to 100 by 10's
What I want to do and I know you can because the graphs I have changed do
just taht I just dont know how. Is when you eneter in the mg\l and the MV I
need it plotted on the graph and a line connecting all the points showing the
curve.
Thanks in advance
Scott
working charts and have changed formulas but have not started one from the
beginning and need help. Here is my info
mg\l MV
..2 255.6
..4 252.2
..5 249.5
..75 241.1
1.0 233.8
5.0 195.6
10.0 182.1
These numbers mg\l and mv will change each testing period. On my graph down
the left side I have the numbers
10.0
9.0
8.0
7.0
6.0
down to 1.0
then it goes from .9 to .1
At the bottom of the graph I start at 300 and count down to 100 by 10's
What I want to do and I know you can because the graphs I have changed do
just taht I just dont know how. Is when you eneter in the mg\l and the MV I
need it plotted on the graph and a line connecting all the points showing the
curve.
Thanks in advance
Scott