B 
		
								
				
				
			
		brianc0428
I am trying to create a forumula to tell me if the date in C2 is atleas
7 business days before B2. The answer will be in G2. I have attache
the spreadsheet. Thanks in advance.
Bria
Attachment filename: new hire report(fixed).xls
Download attachment: http://www.excelforum.com/attachment.php?postid=62222
				
			7 business days before B2. The answer will be in G2. I have attache
the spreadsheet. Thanks in advance.
Bria
Attachment filename: new hire report(fixed).xls
Download attachment: http://www.excelforum.com/attachment.php?postid=62222