G
Guest
I have an excel file with a number of 25 row x 8 column ranges defined as
named ranges (example: $A$1:$H$25 is named range DATA1, $A$26:$H$50 is named
range DATA2, etc). The data in these ranges is entered into the cells and
within the range there is a chart that is locked to some of the cells within
the range.
I use PP to present this information, displaying 4 groups of information
(ranges) on each PP page. The data is entered into PP by going to excel,
selecting the named range, going to PP and using Paste Special / Paste Link
and pasting the excel object into PP. Now when I update excel the PP is also
updated.
Everything works great until I enter a new row within excel between the
existing ranges. Even though the object linked in PP is to a named range, the
PP link does not realize new rows have been added an continues to look at the
original location. Example: added 25 rows between rows 25 and 26. The PP link
that initially looked for $A$26:$H$50 still goes to this location after the
25 new rows are added. How can I get PP to update the abolute addresses when
exel rows are added?
Thanks
Frank
named ranges (example: $A$1:$H$25 is named range DATA1, $A$26:$H$50 is named
range DATA2, etc). The data in these ranges is entered into the cells and
within the range there is a chart that is locked to some of the cells within
the range.
I use PP to present this information, displaying 4 groups of information
(ranges) on each PP page. The data is entered into PP by going to excel,
selecting the named range, going to PP and using Paste Special / Paste Link
and pasting the excel object into PP. Now when I update excel the PP is also
updated.
Everything works great until I enter a new row within excel between the
existing ranges. Even though the object linked in PP is to a named range, the
PP link does not realize new rows have been added an continues to look at the
original location. Example: added 25 rows between rows 25 and 26. The PP link
that initially looked for $A$26:$H$50 still goes to this location after the
25 new rows are added. How can I get PP to update the abolute addresses when
exel rows are added?
Thanks
Frank