How to do incremetal

  • Thread starter Thread starter Joe
  • Start date Start date
J

Joe

First of all thanks to S. Vijay with his help with an
earlier problem.

When I schedule an incremental back up task to run
everyday do i need to create a diffrent scedule for every
day i want to do a backup? Other wise it will overwright
the previous days incremental backup right?

Also i have been running diffriental backups and now want
to switch to incremental do i need to uncheck all the
archive boxes which diffriental put there so an
incremental can run or will this not matter when i run my
first normal backup and the my incrementals?

Thanks very much

Joe
 
First of all thanks to S. Vijay with his help with an
earlier problem.

When I schedule an incremental back up task to run
everyday do i need to create a diffrent scedule for every
day i want to do a backup? Other wise it will overwright
the previous days incremental backup right?

Also i have been running diffriental backups and now want
to switch to incremental do i need to uncheck all the
archive boxes which diffriental put there so an
incremental can run or will this not matter when i run my
first normal backup and the my incrementals?

Thanks very much

Joe

Use the technique in tip 2265 in the 'Tips & Tricks' at http://www.jsiinc.com to
label each days backup with the date/time.


Jerold Schulman
Windows: General MVP
JSI, Inc.
http://www.jsiinc.com
 

Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments. After that, you can post your question and our members will help you out.

Ask a Question

Similar Threads

backup 1
Backing up 1
incremental backups 1
Backup full and incremental 4
Backing up is hard to do 2
NTBACKUP - How do I update existing backup set? 1
Failed Backup 1
Excel worksheets auto-incremeting question 2

Back
Top