I have a 1500+ row by 36 column spreadsheet. I link in three different
spreadsheets (each representing approximately 25% of the columns). Two files
link fairly quickly (30 seconds or so). The third file takes 5-7 minutes.
How can I improve the performance of the linking process? The three external
files are all on the same network folder.
 
I've found that performance is much quicker when the linked files are
open at the same time

Regards