G
Guest
I have a training database in which the students are in either 5-level or
7-level upgrade training. I have a master task table(Classes) and a
sub-tasks table(Assignments). The sub-tasks are broken down into 5-level or
7-level tasks. In my Students form I select whether the student is upgrading
to a 5 or 7-level through a toggle switch.
Instead of going through and having to assign the student to each sub-task
individually (it came from a template), how can I get access to auto-assign
all the tasks automatically when I select the 5 or 7-level toggle?
7-level upgrade training. I have a master task table(Classes) and a
sub-tasks table(Assignments). The sub-tasks are broken down into 5-level or
7-level tasks. In my Students form I select whether the student is upgrading
to a 5 or 7-level through a toggle switch.
Instead of going through and having to assign the student to each sub-task
individually (it came from a template), how can I get access to auto-assign
all the tasks automatically when I select the 5 or 7-level toggle?