Format Question

  • Thread starter Thread starter donl
  • Start date Start date
D

donl

Hello! I am trying to set cell A5 = A1 + A2.

The problem that I encounter is Cell A1 is all text and Cell A2 is a
Julian Date that I converted to form of 5/1/2005.

When I try to set Cell A5 = A1+A2 I lose the Date Formatting and Cell
A5 brings over the text and the julian date.

Any way to do this?
 
One way:

A5: =A1 & TEXT(A2, "m/d/yyyy")

I'm assuming that your "Julian date" is the XL sequential number for the
date, rather than a true Julian date.
 
Back
Top