Tony
I have been struggling with this for quite a while. I am
trying to track overdue dates.
Here's the setup.
ColA contain a date on which I run the check, eg today's
13/10/2004.
ColI contains the date I am trying to track. If the date
in ColI is 2 days less than the date of ColA then it's
needs to be flagged red, e.g. 11/10/2004 or 05/10/2004.
If the date is within the last 2 days (12/10/2004) then it
doesn't need flagged. Sometimes there may be blanks so I
would need to account for this.
Hope this makes sense.
I'm ok with conditional formatting but its the formula
that gets me.
Can someone help. Thanks.
Tony
trying to track overdue dates.
Here's the setup.
ColA contain a date on which I run the check, eg today's
13/10/2004.
ColI contains the date I am trying to track. If the date
in ColI is 2 days less than the date of ColA then it's
needs to be flagged red, e.g. 11/10/2004 or 05/10/2004.
If the date is within the last 2 days (12/10/2004) then it
doesn't need flagged. Sometimes there may be blanks so I
would need to account for this.
Hope this makes sense.
I'm ok with conditional formatting but its the formula
that gets me.
Can someone help. Thanks.
Tony