4 or 5 week months?

  • Thread starter Thread starter Guest
  • Start date Start date
G

Guest

I am designing a new overtime form and our overtime policy states that each
form must be from the First Monday of the month until the week commencing on
the last Monday of the month.

I would like to have it so that if you enter the start date of the overtime
form (in field B2) at the top of the page the 5 columns all headed with dates
are automatically populated.

This is easy enough with the first column (C8) =B2, and all later dates
=C8+7, =D8+7, etc.

The problem is...

If I enter the start period as yesterday 4/9/2005 (sorry, I'm English, so
may have the date the wrong way round for the Americans!) then the final
Monday of the 5 week period will be 2/10/2005, in the following month. In
this case, instead of automatically updating to 2/10/2005, I would like the
field to remain blank and only 4 of the columns to be headed.

Is this possible?

Many thanks in advance!
 
I am designing a new overtime form and our overtime policy states that each
form must be from the First Monday of the month until the week commencing on
the last Monday of the month.

I would like to have it so that if you enter the start date of the overtime
form (in field B2) at the top of the page the 5 columns all headed with dates
are automatically populated.

This is easy enough with the first column (C8) =B2, and all later dates
=C8+7, =D8+7, etc.

The problem is...

If I enter the start period as yesterday 4/9/2005 (sorry, I'm English, so
may have the date the wrong way round for the Americans!) then the final
Monday of the 5 week period will be 2/10/2005, in the following month. In
this case, instead of automatically updating to 2/10/2005, I would like the
field to remain blank and only 4 of the columns to be headed.

Is this possible?

Many thanks in advance!

Perhaps this will help:

With any date in B2, the first Monday of that month is given by the formula:

=B2-DAY(B2)+8-WEEKDAY(B2-DAY(B2)+6)

(This may not be necessary, but might be easier than ensuring the date you
enter in B2 is always the first Monday).

To ensure, as you copy down the column, that the field remains blank, there are
several options.

1. Change your formula to read:

D8: =IF(MONTH(C8+7)=MONTH($C$8),C8+7,"")

or, you could use conditional formatting.

Highlight the entire range with C8 the active cell.

Format/Conditional Formatting/Formula Is:
=MONTH(C8)<>MONTH($C$8)

Then Format the font color to white (or whatever the background color is).


--ron
 
Matt,

If I understand you correctly in G8 enter the formula:

=IF(MONTH(F8+7)=MONTH(C8),F8+7,"")

--
HTH

Sandy
(e-mail address removed)
Replace@mailinator with @tiscali.co.uk
 
Hi Matt,

Write into cell C8:
=IF(MONTH($B$2)=MONTH($B$2+(COLUMN()-3)*7),$B$2+(COLUMN()-3)*7,"")

and copy this to D8:F8.

HTH,
Bernd
 
It should be possible. In D8, type the following formula:
=if(month($b2)<>month((c8+7)),"",c8+7)
Compare the month of the start date to the month of the previous column
heading plus 7 days. If they are not equal, then do nothing ("").
Otherwise, take the previous column heading and add 7 days to it.

I wrote the formula so you could copy it to the remaining 3 column headings.

Best wishes.

Scott
 
Hi,

For the column header for the 5th column (G8, I guess), use the formula,
=IF(MONTH(F8+7)>MONTH(F8),"",F8+7)

Regards,
B.R. Ramachandran
 
Wow, more responses that I expected.

Thanks a lot guys - I didn't realise that there was a MONTH function that
would have made it easier!
 

Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments. After that, you can post your question and our members will help you out.

Ask a Question

Back
Top