A
Aymanh
Hi:
I'm using the windows XP backup tool, and I scheduled 5 jobs on every day of
the week except Sun and Sat. the jobs only ran once, evern though the
server is runs over night, what is the problem?
PS. the backups are stored on a third hard drive on the server then being
burned on a DVD! "is that a good practice?"
Ayman
I'm using the windows XP backup tool, and I scheduled 5 jobs on every day of
the week except Sun and Sat. the jobs only ran once, evern though the
server is runs over night, what is the problem?
PS. the backups are stored on a third hard drive on the server then being
burned on a DVD! "is that a good practice?"
Ayman