F
fwday
I have made a schedule in a graph form. Each colum on the worksheet is
15 min. I fill in each square for the deration of there shift. At the
end I have a graph drawn a worksheet that I can see everyones starting
times and ending times with a lunch. I then know how many peaple I
have every 15 min. There is about 50 people a day on this schedual.
I then want excel to put that schedule on anouther worksheet. I just
don't know how to get it to recignize the timeline.
Thank
(e-mail address removed)
15 min. I fill in each square for the deration of there shift. At the
end I have a graph drawn a worksheet that I can see everyones starting
times and ending times with a lunch. I then know how many peaple I
have every 15 min. There is about 50 people a day on this schedual.
I then want excel to put that schedule on anouther worksheet. I just
don't know how to get it to recignize the timeline.
Thank
(e-mail address removed)