Update dates using CreateDate or Date field

  • Thread starter Thread starter Guest
  • Start date Start date
G

Guest

Using Word 2007 and I have a template I created with a CreateDate field.
When I create a new doc it gives me the current date which is good. I save
the doc and later I would like to be able to open the DOC and make a small
change to the document and then save it with a different name. I woudl also
like the date to be current on this new revision of the old doc. Even if I
right-click the field the update button doesnt change the date.

Any suggestions?
 
If you use Save As, you should be getting a new creation date, so it should
be possible to update the CreateDate field using F9 (unless it's locked or
has been converted to text).

--
Suzanne S. Barnhill
Microsoft MVP (Word)
Words into Type
Fairhope, Alabama USA

Email cannot be acknowledged; please post all follow-ups to the newsgroup so
all may benefit.
 
Oh, that was easy! Thanks!

Suzanne S. Barnhill said:
If you use Save As, you should be getting a new creation date, so it should
be possible to update the CreateDate field using F9 (unless it's locked or
has been converted to text).

--
Suzanne S. Barnhill
Microsoft MVP (Word)
Words into Type
Fairhope, Alabama USA

Email cannot be acknowledged; please post all follow-ups to the newsgroup so
all may benefit.
 
Back
Top