MikeRZA
Hi all
I'm running into a frustrating problem, I'm creating a timetable
workschedule and preplan it month by month. For every month I assign a
specific Job to each day so that every day has a specific job attached to it.
Even though I try and stick to the schedule some jobs take longer than
expected and I need to assign more days to them. I do this by simply
inserting the job into an adjacent day and shifting everything over one day
to the right.
So far so good.
The problem arises when I have jobs that can't be moved, so when I insert an
extra day for a longer than expected job, I need the resultant rightward cell
shift to skip these strict deadline jobs and shift past them like they don't
exist.
If anyone can help that would be great
Thanks
Mike
I'm running into a frustrating problem, I'm creating a timetable
workschedule and preplan it month by month. For every month I assign a
specific Job to each day so that every day has a specific job attached to it.
Even though I try and stick to the schedule some jobs take longer than
expected and I need to assign more days to them. I do this by simply
inserting the job into an adjacent day and shifting everything over one day
to the right.
So far so good.
The problem arises when I have jobs that can't be moved, so when I insert an
extra day for a longer than expected job, I need the resultant rightward cell
shift to skip these strict deadline jobs and shift past them like they don't
exist.
If anyone can help that would be great
Thanks
Mike