G
Guest
How can I count the number of days there are in a query if the results are
bringing up varying dats and results that are the same, so for example..
10/02/2005
10/02/2005
11/02/2005
11/02/2005
15/02/2005
15/02/2005
15/02/2005
15/02/2005
16/02/2005
I want the result from the equation to be how many individual days there are
there, so in this case the numerical output would be 4, as there are 4
seperate days. I need this to work out wages based on day rate rather than an
hourly rate.
bringing up varying dats and results that are the same, so for example..
10/02/2005
10/02/2005
11/02/2005
11/02/2005
15/02/2005
15/02/2005
15/02/2005
15/02/2005
16/02/2005
I want the result from the equation to be how many individual days there are
there, so in this case the numerical output would be 4, as there are 4
seperate days. I need this to work out wages based on day rate rather than an
hourly rate.