Dates against Word traced changes

  • Thread starter Thread starter Guest
  • Start date Start date
G

Guest

When a document contains tracked changes, the dates identified in the tooltip
associated with a tracked change are in American format (mm/dd/yy).
My PC is generically configured to present dates in UK format.
How can I get the date presentation in such tooltips also to be in UK format
(dd/mm/yy)?
 
Back
Top