G
GaryM
Using a macro that cuts and pastes data to differing
locations. When the Selection.Copy runs it is VERY SLOW, as
in over 60 seconds for every operations. The paste
portion is almost instantaneous. On a small spreadsheet,
IE 15 to 20 lines with 45 to 60 Cut and paste operations,
before SP3 and the RPC hotfix would run in about 2 to 3
minutes. At 45 minutes today 7 of the 20 rows had been
processed. Any Ideas? Is this a know issue. Right
click/copy and Ctrl C also exhibit the same slow response.
Gary L. Matthews
locations. When the Selection.Copy runs it is VERY SLOW, as
in over 60 seconds for every operations. The paste
portion is almost instantaneous. On a small spreadsheet,
IE 15 to 20 lines with 45 to 60 Cut and paste operations,
before SP3 and the RPC hotfix would run in about 2 to 3
minutes. At 45 minutes today 7 of the 20 rows had been
processed. Any Ideas? Is this a know issue. Right
click/copy and Ctrl C also exhibit the same slow response.
Gary L. Matthews