Change Schedule for PFBackup

  • Thread starter Thread starter John Collins
  • Start date Start date
J

John Collins

It seems that the PFBackup utility for Outlook XP could be set to execute
each time Outlook was closed. The PFBackup for Outlook 2003 can only be set
for a minimum of 1 day.

I have some users who are mobile and need to ensure that PFBackup executes
in less than a 24 hour period as the backup is copied to their networked
home folder.

Does anyone know how to make the latest version execute each time Outlook is
closed? Or to be set to less than one day?

Regards,

John
 
all it does is copy the pst - why not use a script to copy your users pst
when they log on to the network?

--
Diane Poremsky [MVP - Outlook]
Author, Teach Yourself Outlook 2003 in 24 Hours
Coauthor, OneNote 2003 for Windows (Visual QuickStart Guide)
Author, Google and Other Search Engines (Visual QuickStart Guide)



Join OneNote Tips mailing list: http://www.onenote-tips.net/
 
Back
Top