Please advised on how to calculate:
I have a forecast = 39,975
I have a shift qty = 7,535
shift production requirement = 5.3 (39975/7535)
What formula will determine the qty of the overage of .3 shifts?
Thank you
I have a forecast = 39,975
I have a shift qty = 7,535
shift production requirement = 5.3 (39975/7535)
What formula will determine the qty of the overage of .3 shifts?