Code to extract holidays and weekends

 
 
=?Utf-8?B?QWxleA==?=
Guest
Posts: n/a
 
      28th Feb 2005
I have the following code that I found in this newsgroup. The code is
working great but I need to modify it a bit to fit my needs and I've tried
several things, but I'm still too much of a novice at VBA to make the code
work the way I need it to. I'm not sure if it's the way I've written the
expression or if I need to revise the actual code, but currently a number of
days in [LTTPX3] are being added to the date [LaunchDate]. I need [LLTPX3]
days subtracted from [LaunchDate]. Also, I have a table called Holidays with
a field called HDates that I need to replace the #1/11/2005# with in the
expression below. I've posted in this newsgroup before asking how to make
the Holiday table an array, but I can't seem to get that to work either. I
appreciate any help you can give me. Thanks so much -

MaterialAvailDate:
IIf([ExcludeDate]="E","",dhAddWorkDaysA([LTTPX3],[LaunchDate],#1/11/2005#))



' ********* Code Start **************
'
' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.
'

Public Function dhAddWorkDaysA(lngDays As Long, _
Optional dtmDate As Date = 0, _
Optional adtmDates As Variant) As Date



' Add the specified number of work days to the
' specified date.

' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.

' In:
' lngDays:
' Number of work days to add to the start date.
' dtmDate:
' date on which to start looking.
' Use the current date, if none was specified.
' adtmDates (Optional):
' Array containing holiday dates. Can also be a single
' date value, if that's what you want.
' Out:
' Return Value:
' The date of the working day lngDays from the start, taking
' into account weekends and holidays.
' Example:
' dhAddWorkDaysA(10, #2/9/2000#, Array(#2/16/2000#, #2/17/2000#))
' returns #2/25/2000#, which is the date 10 work days
' after 2/9/2000, if you treat 2/16 and 2/17 as holidays
' (just made-up holidays, for example purposes only).

' Did the caller pass in a date? If not, use
' the current date.
Dim lngCount As Long
Dim dtmTemp As Date


If dtmDate = 0 Then
dtmDate = Date
End If

dtmTemp = dtmDate
For lngCount = 1 To lngDays
dtmTemp = dhNextWorkdayA(dtmTemp, adtmDates)
Next lngCount
dhAddWorkDaysA = dtmTemp
End Function

Public Function dhNextWorkdayA( _
Optional dtmDate As Date = 0, _
Optional adtmDates As Variant = Empty) As Date

' Return the next working day after the specified date.

' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.

' Requires:
' SkipHolidays
' IsWeekend

' In:
' dtmDate:
' date on which to start looking.
' Use the current date, if none was specified.
' adtmDates (Optional):
' Array containing holiday dates. Can also be a single
' date value.
' Out:
' Return Value:
' The date of the next working day, taking
' into account weekends and holidays.
' Example:
' ' Find the next working date after 5/30/97
' dtmDate = dhNextWorkdayA(#5/23/1997#, #5/26/97#)
' ' dtmDate should be 5/27/97, because 5/26/97 is Memorial day.

' Did the caller pass in a date? If not, use
' the current date.
If dtmDate = 0 Then
dtmDate = Date
End If

dhNextWorkdayA = SkipHolidaysA(adtmDates, dtmDate + 1, 1)
End Function

Public Function dhPreviousWorkdayA( _
Optional dtmDate As Date = 0, _
Optional adtmDates As Variant = Empty) As Date

' Return the previous working day before the specified date.

' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.

' Requires:
' SkipHolidays
' IsWeekend

' In:
' dtmDate:
' date on which to start looking.
' Use the current date, if none was specified.
' adtmDates (Optional):
' Array containing holiday dates. Can also be a single
' date value.
' Out:
' Return Value:
' The date of the previous working day, taking
' into account weekends and holidays.
' Example:
' ' Find the next working date before 1/1/2000

' dtmDate = dhPreviousWorkdayA(#1/1/2000#, Array(#12/31/1999#,
#1/1/2000#))
' ' dtmDate should be 12/30/1999, because of the New Year's holidays.

' Did the caller pass in a date? If not, use
' the current date.
If dtmDate = 0 Then
dtmDate = Date
End If

dhPreviousWorkdayA = SkipHolidaysA(adtmDates, dtmDate - 1, -1)
End Function

Public Function dhFirstWorkdayInMonthA( _
Optional dtmDate As Date = 0, _
Optional adtmDates As Variant = Empty) As Date

' Return the first working day in the month specified.

' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.

' Requires:
' SkipHolidays
' IsWeekend

' In:
' dtmDate:
' date within the month of interest.
' Use the current date, if none was specified.
' adtmDates (Optional):
' Array containing holiday dates. Can also be a single
' date value.
' Out:
' Return Value:
' The date of the first working day in the month, taking
' into account weekends and holidays.
' Example:
' ' Find the first working day in 1999
' dtmDate = dhFirstWorkdayInMonthA(#1/1/1999#, #1/1/1999#)

Dim dtmTemp As Date

' Did the caller pass in a date? If not, use
' the current date.
If dtmDate = 0 Then
dtmDate = Date
End If

dtmTemp = DateSerial(Year(dtmDate), Month(dtmDate), 1)
dhFirstWorkdayInMonthA = SkipHolidaysA(adtmDates, dtmTemp, 1)
End Function

Public Function dhLastWorkdayInMonthA( _
Optional dtmDate As Date = 0, _
Optional adtmDates As Variant = Empty) As Date

' Return the last working day in the month specified.

' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.

' Requires:
' SkipHolidays
' IsWeekend

' In:
' dtmDate:
' date within the month of interest.
' Use the current date, if none was specified.
' adtmDates (Optional):
' Array containing holiday dates. Can also be a single
' date value.
' Out:
' Return Value:
' The date of the last working day in the month, taking
' into account weekends and holidays.
' Example:
' ' Find the last working day in 1999
' dtmDate = dhLastWorkdayInMonthA(#12/1/1999#, #12/31/1999#)

Dim dtmTemp As Date

' Did the caller pass in a date? If not, use
' the current date.
If dtmDate = 0 Then
dtmDate = Date
End If

dtmTemp = DateSerial(Year(dtmDate), Month(dtmDate) + 1, 0)
dhLastWorkdayInMonthA = SkipHolidaysA(adtmDates, dtmTemp, -1)
End Function

Public Function dhCountWorkdaysA(ByVal dtmStart As Date, ByVal dtmEnd As
Date, _
Optional adtmDates As Variant = Empty) _
As Integer

' Count the business days (not counting weekends/holidays) in
' a given date range.

' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.

' Requires:
' SkipHolidays
' CountHolidays
' IsWeekend

' In:
' dtmStart:
' Date specifying the start of the range (inclusive)
' dtmEnd:
' Date specifying the end of the range (inclusive)
' (dates will be swapped if out of order)
' adtmDates (Optional):
' Array containing holiday dates. Can also be a single
' date value.
' Out:
' Return Value:
' Number of working days (not counting weekends and optionally,
holidays)
' in the specified range.
' Example:
' Debug.Print dhCountWorkdaysA(#7/2/2000#, #7/5/2000#, _
' Array(#1/1/2000#, #7/4/2000#))
'
' returns 2, because 7/2/2000 is Sunday, 7/4/2000 is a holiday,
' leaving 7/3 and 7/5 as workdays.

Dim intDays As Integer
Dim dtmTemp As Date
Dim intSubtract As Integer

' Swap the dates if necessary.>
If dtmEnd < dtmStart Then
dtmTemp = dtmStart
dtmStart = dtmEnd
dtmEnd = dtmTemp
End If

' Get the start and end dates to be weekdays.
dtmStart = SkipHolidaysA(adtmDates, dtmStart, 1)
dtmEnd = SkipHolidaysA(adtmDates, dtmEnd, -1)
If dtmStart > dtmEnd Then
' Sorry, no Workdays to be had. Just return 0.
dhCountWorkdaysA = 0
Else
intDays = dtmEnd - dtmStart + 1

' Subtract off weekend days. Do this by figuring out how
' many calendar weeks there are between the dates, and
' multiplying the difference by two (because there are two
' weekend days for each week). That is, if the difference
' is 0, the two days are in the same week. If the
' difference is 1, then we have two weekend days.
intSubtract = (DateDiff("ww", dtmStart, dtmEnd) * 2)

' The answer to our quest is all the weekdays, minus any
' holidays found in the table.
intSubtract = intSubtract + _
CountHolidaysA(adtmDates, dtmStart, dtmEnd)

dhCountWorkdaysA = intDays - intSubtract
End If
End Function

Private Function CountHolidaysA( _
adtmDates As Variant, _
dtmStart As Date, dtmEnd As Date) As Long

' Count holidays between two end dates.
'
' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.

' Required by:
' dhCountWorkdays

' Requires:
' IsWeekend


Dim lngItem As Long
Dim lngCount As Long
Dim blnFound As Long
Dim dtmTemp As Date

On Error GoTo HandleErr
lngCount = 0
Select Case VarType(adtmDates)
Case vbArray + vbDate, vbArray + vbVariant
' You got an array of variants, or of dates.
' Loop through, looking for non-weekend values
' between the two endpoints.
For lngItem = LBound(adtmDates) To UBound(adtmDates)
dtmTemp = adtmDates(lngItem)
If dtmTemp >= dtmStart And dtmTemp <= dtmEnd Then
If Not IsWeekend(dtmTemp) Then
lngCount = lngCount + 1
End If
End If
Next lngItem
Case vbDate
' You got one date. So see if it's a non-weekend
' date between the two endpoints.
If adtmDates >= dtmStart And adtmDates <= dtmEnd Then
If Not IsWeekend(adtmDates) Then
lngCount = 1
End If
End If
End Select

ExitHere:
CountHolidaysA = lngCount
Exit Function

HandleErr:
' No matter what the error, just
' return without complaining.
' The worst that could happen is that the code
' include a holiday as a real day, even if
' it's in the table.
Resume ExitHere
End Function

Private Function FindItemInArray(varItemToFind As Variant, _
avarItemsToSearch As Variant) As Boolean
Dim lngItem As Long

On Error GoTo HandleErrors

For lngItem = LBound(avarItemsToSearch) To UBound(avarItemsToSearch)
If avarItemsToSearch(lngItem) = varItemToFind Then
FindItemInArray = True
GoTo ExitHere
End If
Next lngItem

ExitHere:
Exit Function

HandleErrors:
' Do nothing at all.
' Return False.
Resume ExitHere
End Function

Private Function IsWeekend(dtmTemp As Variant) As Boolean
' If your weekends aren't Saturday (day 7) and Sunday (day 1),
' change this routine to return True for whatever days
' you DO treat as weekend days.

' Modified from code in "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.

' Required by:
' SkipHolidays
' dhFirstWorkdayInMonth
' dbLastWorkdayInMonth
' dhNextWorkday
' dhPreviousWorkday
' dhCountWorkdays

If VarType(dtmTemp) = vbDate Then
Select Case Weekday(dtmTemp)
Case vbSaturday, vbSunday
IsWeekend = True
Case Else
IsWeekend = False
End Select
End If
End Function

Private Function SkipHolidaysA( _
adtmDates As Variant, _
dtmTemp As Date, intIncrement As Integer) As Date
' Skip weekend days, and holidays in the array referred to by adtmDates.
' Return dtmTemp + as many days as it takes to get to a day that's not
' a holiday or weekend.

' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.

' Required by:
' dhFirstWorkdayInMonthA
' dbLastWorkdayInMonthA
' dhNextWorkdayA
' dhPreviousWorkdayA
' dhCountWorkdaysA

' Requires:
' IsWeekend

Dim strCriteria As String
Dim strFieldName As String
Dim lngItem As Long
Dim blnFound As Boolean

On Error GoTo HandleErrors

' Move up to the first Monday/last Friday, if the first/last
' of the month was a weekend date. Then skip holidays.
' Repeat this entire process until you get to a weekday.
' Unless adtmDates an item for every day in the year (!)
' this should finally converge on a weekday.

Do
Do While IsWeekend(dtmTemp)
' Missy
dtmTemp = dtmTemp + intIncrement
Loop
Select Case VarType(adtmDates)
Case vbArray + vbDate, vbArray + vbVariant
Do
blnFound = FindItemInArray(dtmTemp, adtmDates)
If blnFound Then
dtmTemp = dtmTemp + intIncrement
End If
Loop Until Not blnFound
Case vbDate
If dtmTemp = adtmDates Then
dtmTemp = dtmTemp + intIncrement
End If
End Select
Loop Until Not IsWeekend(dtmTemp)

ExitHere:
SkipHolidaysA = dtmTemp
Exit Function

HandleErrors:
' No matter what the error, just
' return without complaining.
' The worst that could happen is that we
' include a holiday as a real day, even if
' it's in the array.
Resume ExitHere
End Function
 
Reply With Quote
 
 
 
Reply

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Skipping Weekends & holidays in VBA Code Secret Squirrel Microsoft Access 10 16th Aug 2008 04:05 AM
weekends and holidays! =?Utf-8?B?c2N1YmFkaXZlcg==?= Microsoft Access Queries 5 27th Apr 2007 04:26 PM
Weekends & Holidays Floyd Forbes Microsoft Access Reports 1 20th Oct 2006 04:43 AM
skip weekends and holidays =?Utf-8?B?U2hlcnls?= Microsoft Access VBA Modules 1 5th Jan 2005 12:16 PM
skipping weekends/holidays Junior Microsoft Access Form Coding 1 14th Mar 2004 11:46 PM