PC Review


Reply
Thread Tools Rate Thread

Cell Reference Changes According to Project

 
 
Anne C.
Guest
Posts: n/a
 
      25th Jun 2008
I am making templates for projects at work with one "Job Reference Sheet"
that all other templates gather their information from. Is there anyway I
can have the templates gather the information automatically when I copy and
paste a new job reference sheet to a new specific job. IE- "job reference
sheet MASTER", changes to "job reference sheet BURBANK" or something to this
effect. Is this possible to do without having to update the formulas every
time?
 
Reply With Quote
 
 
 
Reply

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
How to add a new reference to your project solution and it is not in the list provided in the Add Reference dialog? steve kwon Microsoft Dot NET 2 22nd Aug 2005 03:16 PM
Visual Basic .Net IDE Add-In that adds a Web Reference or Normal Reference to Current Project Bahige Microsoft VB .NET 0 1st Nov 2004 06:24 PM
reference from console project to web project dll creates a copy of the DLL. z. f. Microsoft Dot NET Framework 2 14th Jun 2004 08:09 AM
Why does updating a web reference in a web application project require the project file to be checked out? Headdeball Microsoft ASP .NET 0 22nd Mar 2004 07:37 PM
Using a project reference rather than assembly reference prevents an interface from working Scott James Microsoft VB .NET 0 8th Oct 2003 02:17 AM


Features
 

Advertising
 

Newsgroups
 


All times are GMT +1. The time now is 01:54 AM.