PC Review


Reply
Thread Tools Rate Thread

calendar in FP 2003

 
 
=?Utf-8?B?anVkaXRoYmVhcg==?=
Guest
Posts: n/a
 
      10th Dec 2005
OK, I'm still trying to solve my 2006 calendar problem. If I already have a
2005 calendar in place made from the FP2005 template, is it possible for me
to just make changes to the pages in FP changing the 2005 calendar to 2006? I
mean, manually going into every page and changing the dates shown in each box
of each month; then delete all the daily verbiage and insert the 2006 info?
If I'm not making myself clear (it's not clear to me!) could you look at my
calendar at http://www.stpaul-florin.org/Calendar/december05.htm and see if
what I'm talking about will work.

I'd really appreciate any help. I'm not proficient with this stuff, just
know enough to get the basics in place. But I really do need help on this
soon as I need to get the 2006 functions up on the site. I realize that I'll
have to duplicate at least the December05 calendar so that I'll have two of
that one for the first month or so.

You guys have helped me before and I really appreciate it. I need advice in
a nontechnical manner. TIA.
--
judith
 
Reply With Quote
 
 
 
 
Stefan B Rusynko
Guest
Posts: n/a
 
      11th Dec 2005
Yes
- make a copy of the template pages and edit it
It is just html

--

_____________________________________________
SBR @ ENJOY (-: [ Microsoft MVP - FrontPage ]
"Warning - Using the F1 Key will not break anything!" (-;
To find the best Newsgroup for FrontPage support see:
http://www.frontpagemvps.com/FrontPa...3/Default.aspx
_____________________________________________


"judithbear" <(E-Mail Removed)> wrote in message news699E87F-B5F6-4480-9310-(E-Mail Removed)...
| OK, I'm still trying to solve my 2006 calendar problem. If I already have a
| 2005 calendar in place made from the FP2005 template, is it possible for me
| to just make changes to the pages in FP changing the 2005 calendar to 2006? I
| mean, manually going into every page and changing the dates shown in each box
| of each month; then delete all the daily verbiage and insert the 2006 info?
| If I'm not making myself clear (it's not clear to me!) could you look at my
| calendar at http://www.stpaul-florin.org/Calendar/december05.htm and see if
| what I'm talking about will work.
|
| I'd really appreciate any help. I'm not proficient with this stuff, just
| know enough to get the basics in place. But I really do need help on this
| soon as I need to get the 2006 functions up on the site. I realize that I'll
| have to duplicate at least the December05 calendar so that I'll have two of
| that one for the first month or so.
|
| You guys have helped me before and I really appreciate it. I need advice in
| a nontechnical manner. TIA.
| --
| judith


 
Reply With Quote
Reply

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
How to COPY the entire contents of a Calendar to another Calendar in Outlook 2003 Cody Microsoft Outlook 6 16th Jul 2009 07:35 PM
Existing 2003 Outlook Calendar was replaced by a blank calendar. mitch Microsoft Outlook Calendar 5 25th Mar 2008 10:42 PM
Outlook 2003 SP2 in cached mode. opening a shared calendar.Error to open calendar Didier.t@gmail.com Microsoft Outlook 0 7th Jun 2007 04:29 PM
how do I update a 2003 event calendar planner to 2005 calendar =?Utf-8?B?cHJvZ3JhbSBwbGFubmVy?= Microsoft Access 3 18th Apr 2005 08:33 PM
Calendar Button Stopped Launching Calendar in Outlook 2003 =?Utf-8?B?Sm9obiBIZWlk?= Microsoft Outlook Calendar 0 23rd Sep 2004 02:55 AM


Features
 

Advertising
 

Newsgroups
 


All times are GMT +1. The time now is 03:34 PM.