PC Review


Reply
Thread Tools Rate Thread

backup scheduling

 
 
tshad
Guest
Posts: n/a
 
      2nd Sep 2007
I am going to look at using either Retrospect or XP Backup to backup my
software. Both can be scheduled. But if your computer is not on at the
time it is scheduled for, it doesn't get done.

Is there a way to tell the schedular that the backup needs to run if it is
past that date and time it is supposed to be run that I need to run it or
just run it when I start the machine?

Thanks,

Tom


 
Reply With Quote
 
 
 
Reply

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Scheduling Backup David Rudman Microsoft Outlook Discussion 1 31st Jan 2010 09:22 PM
scheduling a backup Chips Windows XP General 7 7th Sep 2009 11:57 AM
Scheduling a backup program DavidM Windows XP Basics 2 17th Jan 2006 06:40 PM
Scheduling a backup in XP Pro Borgholio Windows XP Help 2 18th Jun 2004 10:54 PM
Scheduling a Backup dlw802 Windows XP General 3 24th Nov 2003 12:11 PM


Features
 

Advertising
 

Newsgroups
 


All times are GMT +1. The time now is 07:16 AM.